
Add to Cart
China Manufacturer Sanitary 304 316 Stainless Steel Welded SS Pipe Tube Price | |
Product Standards | Food Grade Sanitary Tube: JIS G3447, KS D 3585, ASTM A270, EN 10357(DIN 11850), AS 1528.1, ISO 2037(NF A49-249) |
Heat exchanger tube: ASTM A249 / ASME SA249, GB / T 24593-2009, HG 20537.2 | |
Industrial pipe: ASTM A312, EN 10217-7, GB / T 12771-2008, HG 20537.3 | |
Drinking water tube: GB / T 19228 | |
Production Size | Outer Diameter Range: 9.5~2000mm Thickness Range: 0.5~20mm (Size can be customized.) Length: Up to 18.3 meters per piece. |
Application | Sanitary tubing: for food processing industry, beverage industry, sugar mill and so on;
Industiral pipe: for petroleum delivery, gas delivery, petrochemical industry, wastewater treatment, drainage system, and so on;
Mechanical tube: handrail, railings, balustrade, hence and so on. |
Chemical Composition | Tensile Strength | Yield Strength | Elongation | Hardness HRB |
Grade 304 Stainless Steel (100% & MPA) | ||||
C≤0.08, Mn≤2, P≤0.045, S≤0.03, Si≤0.75, 8≤Ni≤10.5, 18≤Cr≤20 | ≥515 | ≥205 | ≥40 | ≤92 |
Grade 304L Stainless Steel (100% & MPA) | ||||
C≤0.03, Mn≤2, P≤0.045, S≤0.03, Si≤0.75, 8≤Ni≤12, 18≤Cr≤20 | ≥485 | ≥170 | ≥40 | ≤92 |
Grade 316L Stainless Steel (100% & MPA) | ||||
C≤0.03, Mn≤2, P≤0.045, S≤0.03, Si≤0.75, 10≤Ni≤14, 16≤Cr≤18 | ≥485 | ≥170 | ≥40 | ≤95 |
Company Profile
FAQ
Q1: Are you trading company or manufacturer ?
A: We are a professional manufacturer with 20 years' experience and have took part in international trade for 10 years.
Q2: How about your quality and how do you guarantee the quality?
A: All products we supply is primary as you need, Our company is certificated to ISO9001: 2008, and every product will be tested for 4-5 processes. We welcome customers or the third party inspection agencies to come to our factory for inspection.
Q3: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge.
Q4: How long is your delivery time?
A: For Stocks, we can send the goods to loading port within 7 days after receiving the deposit ;
For production period, it usually needs about 15 days ~30 days after receiving the deposit.